Project Examples – Lower Granite Lock & Dam
Olsson_Project_Example_19.3.4

Lower Granite Lock & Dam Spillway Pit Tag Monitoring System Installation

Overview

Installation of pit tag antenna system in spillway, transceiver data collection room, instrumentation and 480V distribution system.

    Client: Northbank Civil and Marine/USACE
    Location: Pomeroy, WA — Snake River
    Timeline: 2018-2020
    Divisions: Controls & Construction
    Value: $1,000,000

    Category:

    Heavy Industrial Electrical Construction
    Hydro Maintenance

    Industry Served:

    Hydroelectric & Hydropower

    Area Served:

    Washington
    Download a PDF of this page

    Related Projects

    Substation

    Vera Water & Power 16th Avenue Substation

    Read more
    Vera Water & Power 16th Avenue Substation

    The John Day North Fish Ladder AWS Pump Replacement

    Read more
    The John Day North Fish Ladder AWS Pump Replacement

    Back to Projects

    Read More

    International Paper – Paper Machine Productivity Improvements

    Overview

    Olsson Industrial Electric served as the lead electrical and controls contractor for a >$100M capital improvement project, increasing production capacity by more than 40,000 tons of containerboard per year. The Olsson construction management team worked hand-in-hand with the customer to plan and execute a complex construction sequence, maximizing pre-outage construction opportunities, streamlining the outage construction schedule, and minimizing overtime costs. Installation, testing and commissioning was handled by a robust team of experienced Olsson electricians and controls technicians. Featuring more than 60 on-site during critical outages, the Olsson team completed this project with craftsman quality and zero safety incidents. 

    Scope

    • Extensive demo of existing systems. Installation, checkout, and commissioning of the following items:
    • One 4600 13 K/600 V transformer, two 1250 HP VFDs, one 450 HP VFD, and several smaller VFDs
    • Extensive temporary power upgrades (MCCs to be used for temporary power during outages)
    • New boiler port rodders, gas skids and start burners; New roll handling system; New winder safety system
    • Thirty-five PLCs and control panels built in-house by our UL-508 panel shop and installed on site
    • Numerous process control instruments
    • 1,200 feet of cable tray, 34,000 feet of conduit and 280,000 feet of cabling
    • Engineering/Project Management for cable pull calcs, labor forcasting, work sequencing, etc.
    • One engineer specifically dedicated to recovery boiler commissioning

    Highlights

    • No lost time, injuries or accidents
    • All work completed on or ahead of time and under budget
    • Over 60 personnel worked safely 24/7 during a 5-week shutdown
    Client: International Paper Company
    Location: Springfield, Oregon
    Timeline: 2015-2017
    Divisions: Construction, Controls & Engineering
    Value: > $6,250,000

    Category:

    Heavy Industrial Electrical Construction
    Plant Automation
    Automation System Analysis

    Industry Served:

    Pulp & Paper

    Area Served:

    Oregon
    Download a PDF of this page

    Related Projects

    Substation

    Vera Water & Power 16th Avenue Substation

    Read more
    Vera Water & Power 16th Avenue Substation

    The John Day North Fish Ladder AWS Pump Replacement

    Read more
    The John Day North Fish Ladder AWS Pump Replacement

    Back to Projects

    Read More

    Superior Energy Arctic Challenger

    Overview

    In September of 2012, Olsson Industrial Electric completed a 10-month electrical installation project for Superior Energy’s Arctic Challenger. Olsson field crews installed, tested and commissioned nearly all of the electrical power distribution equipment for the vessel. Electricians worked around the clock to complete the project on time. Scheduling included a 4-month period of time in which 40 Olsson electricians worked seven, twelve-hours shifts.  

    Scope

    • 480 V power distribution
    • Class I Division I and II electrical installation
    • Extensive instrumentation device calibration and installation
    • Instrumentation tubing installation
    • Cable tray design
    • 24 VDC process control

    Highlights

    • Zero safety incidents
    Client: Superior Energy
    Location: Bellingham, Washington
    Timeline: Completed September 2012
    Divisions: Construction, Controls & Engineering
    Value: $4,600,000

    Category:

    Heavy Industrial Electrical Construction
    Power Distribution
    Power System Design & Analysis

    Area Served:

    Washington
    Download a PDF of this page

    Related Projects

    Substation

    Vera Water & Power 16th Avenue Substation

    Read more
    Vera Water & Power 16th Avenue Substation

    The John Day North Fish Ladder AWS Pump Replacement

    Read more
    The John Day North Fish Ladder AWS Pump Replacement

    Back to Projects

    Read More
    electricians

    Kapstone #11 Paper Machine HCR Refiner and ENP Press Project

    Overview

    In 2013, Olsson Industrial Electric completed a project for Kapstone involving a commissioning shutdown that required 48 electricians on a 24-hour schedule for 4 days.

    Scope

    • 13.8 kV power distribution
    • 13.8 kV soft start
    • 575 V switchgear
    • 12,000 HP motor and control installation
    • Basler Field exiter enclosure
    • 1,200 HP DC drives and motors
    • 480 V MCC’s
    • Assemble and install PLC panels
    • 575 VDC motor wiring
    • 120 VAC control wiring
    • 24 VDC control wiring
    • Communication infrastructure
    • Lighting system

    Highlights

    • Zero safety incidents
    • Involved a commissioning shutdown that required 48 Electricians on a 24-hour schedule for four days
    Client: Kapstone
    Location: Longview, WA
    Timeline: 2012 – 2013
    Divisions: Electric, Engineering & Controls
    Value: $1,200,000

    Category:

    Hydro Design
    Power Distribution
    Power System Design & Analysis
    Automation System Analysis

    Industry Served:

    Pulp & Paper

    Area Served:

    Washington
    Download a PDF of this page

    Related Projects

    Substation

    Vera Water & Power 16th Avenue Substation

    Read more
    Vera Water & Power 16th Avenue Substation

    The John Day North Fish Ladder AWS Pump Replacement

    Read more
    The John Day North Fish Ladder AWS Pump Replacement

    Back to Projects

    Read More

    Seneca Sawmill Co-Gen Facility

    Overview

    Olsson Industrial Electric was hired to complete the electrical installation of Seneca Sawmill’s Co-Generation facility located in Eugene, OR.

    Scope

    • Installed 15 kV plant-wide distribution
    • 480 VAC MCC installation in the following locations: Truck Dump Area, Fuel Handling and Storage System, and Co-Gen building
    • PLC/Control System installation in the following locations: Truck Dump Area, Fuel Handling and Storage System, and Co-Gen building
    • Documented and rewired controls on 19 MW generator
    • Installed a plant-wide lighting system

    Highlights

    • Zero safety incidents
    Client: Seneca Sawmill Company
    Location: Eugene, Oregon
    Timeline: 2010
    Divisions: Construction & Controls
    Value: $2,600,000

    Category:

    Heavy Industrial Electrical Construction
    Plant Automation
    Power Distribution
    Power System Design & Analysis

    Industry Served:

    Timber & Forest Products

    Area Served:

    Oregon
    Download a PDF of this page

    Related Projects

    Substation

    Vera Water & Power 16th Avenue Substation

    Read more
    Vera Water & Power 16th Avenue Substation

    The John Day North Fish Ladder AWS Pump Replacement

    Read more
    The John Day North Fish Ladder AWS Pump Replacement

    Back to Projects

    Read More

    ATI Intermediate Work Cell

    Overview

    Olsson Industrial Electric completed a project to install a conveyor storage and robot work cell system in the ATI Titanium Foundry in Albany, Oregon. This project involved concept design, engineering and installation of a storage conveyor and robot work cell to process parts through the foundry mold process. The robot work cell was designed to process parts through a slurry dip, sand operation and transfer finished parts to the storage conveyor.

    Olsson was the general contractor for this project and was responsible for all engineering (structural, electrical and mechanical) and construction of the system. The Olsson project management team coordinated five subcontractors to facilitate a complete system design from concept to production operation. The system was implemented with the latest controls equipment (Allen Bradley, ABB, Ignition SCADA and Fanuc Robots).

    Scope

    • Developed system concept to meet customer process requirements
    • Concept system with simulation software (Simu8) to provide realistic simulated system performance
    • Olsson developed a team of subcontractors to provide a robust design to accomplish requirements from concept
    • Management of project to deliver on milestones, budget, and tasks required to implement the design
    • Provided engineering and construction for electrical components and software needed to run the system
    • Managed subcontractors to deliver design and engineering for mechanical, structural, and construction of the system
    • Worked with the customer to facilitate construction schedules to minimize current production impact during installation
    • Coordinated design and engineering between multiple subcontractors to provide the conveyor system which would store, dry (airflow around parts) and transfer parts between different robotic clips

    Highlights

    • Managed installation of Fancu M-2000iA/900L Robot.
    • System in full production two days before scheduled production date.
    Client: ATI
    Location: Albany, Oregon
    Timeline: September 2014 – November 2015
    Divisions: Construction, Controls & Engineering
    Value: $3,155,000

    Category:

    Heavy Industrial Electrical Construction
    SCADA Systems Programming

    Industry Served:

    Metal & Recycling

    Area Served:

    Oregon
    Download a PDF of this page

    Related Projects

    Substation

    Vera Water & Power 16th Avenue Substation

    Read more
    Vera Water & Power 16th Avenue Substation

    The John Day North Fish Ladder AWS Pump Replacement

    Read more
    The John Day North Fish Ladder AWS Pump Replacement

    Back to Projects

    Read More
    commissioning of a paper mill

    Greenberry Cosmo Specialty Fibers Paper Mill Start-Up

    Overview

    Olsson Industrial Electric completed a project in the spring of 2012 that included the start-up and commissioning of a paper mill that had been shuttered for the past five years. Due to a compressed construction schedule, the Olsson field crew worked around the clock in order to complete the project. The project featured 24-hour staffing. 

    Scope

    • Replaced 2,478 total instruments
    • Inspected conduit and fittings, and repaired any issues found
    • Instruments were tested for functionality and to verify information to PLC or DCS
    • Damaged instruments and wires were repaired or replaced
    • 250 process critical instruments were bench calibrated, the remaining 2,228 were field calibrated
    • Performed point check for all I/O points and DCS loops
    • Made PLC, HMI, and DCS programming changes as needed for the new owner’s process
    • Repaired or replaced PLC, HMI, and DCS as needed
    • Replaced 1,163 total motors
    • MCC buckets were inspected and cleaned, and repaired any issues found
    • Meggered all motors, and replaced or repaired any issues found
    • Bumped each motor to verify rotation
    • Medium Voltage Switch Gear was inspected, cleaned and tested
    • Transformers and breakers were tested, and all issues were repaired or replaced

    Highlights

    • Zero safety incidents
    Client: Greenberry Industrial
    Location: Cosmopolis, Washington
    Timeline: 2012
    Divisions: Construction, Controls & Engineering
    Value: $4,000,000

    Category:

    Hydro Design
    Power System Design & Analysis
    Automation System Analysis

    Industry Served:

    Pulp & Paper

    Area Served:

    Washington
    Download a PDF of this page

    Related Projects

    Substation

    Vera Water & Power 16th Avenue Substation

    Read more
    Vera Water & Power 16th Avenue Substation

    The John Day North Fish Ladder AWS Pump Replacement

    Read more
    The John Day North Fish Ladder AWS Pump Replacement

    Back to Projects

    Read More

    Bonneville Dam Station Service Improvements

    Overview

    In October of 2011, Olsson Industrial Electric completed a prime contract to upgrade the Station Service electrical systems at the Bonneville Lock and Dam. Improvements included: the replacement of three double ended 480 V substations, associated medium voltage cabling, integration with GFE transformer and controls, high resistance ground systems, and panel boards. Additionally, this project included the application of temporary power sources to ensure continued power plant operations during all construction and commissioning phases.

    Scope

    • Removed existing 480 V switchgear lineups
    • Designed, supplied and installed new 480 V switchgear lineups
    • Installed transformers and addition of air terminal chambers for double ended substations
    • Analyzed, designed and installed surge capacitators
    • Replaced 13.8 kV feeders
    • Installed and integrated remote operating panels
    • Installed and programmed digital protective device relays and automatic transfer controls
    • Supplied remote racking devices and training on new switchgear

    Highlights

    • Zero safety incidents while working in an energized power production facility
    • “Outstanding” performance rating from the U.S. Army Corps of Engineers
    Client: U.S. Army Corps of Engineers
    Location: Cascade Locks, Oregon
    Timeline: October 2011 – March 2013
    Divisions: Construction, Controls & Engineering
    Value: $4,600,000

    Category:

    Heavy Industrial Electrical Construction
    Hydro Design
    Hydro Maintenance

    Industry Served:

    Hydroelectric & Hydropower

    Area Served:

    Oregon
    Download a PDF of this page

    Related Projects

    Substation

    Vera Water & Power 16th Avenue Substation

    Read more
    Vera Water & Power 16th Avenue Substation

    The John Day North Fish Ladder AWS Pump Replacement

    Read more
    The John Day North Fish Ladder AWS Pump Replacement

    Back to Projects

    Read More

    Seneca Sawmill Dimension Kilns Electric Installation

    Overview

    In May of 2015, Olsson Industrial Electric initiated a mill expansion project for Seneca Sawmill in Eugene, Oregon. The expansion included multiple additions and upgrades. New dimension kilns were one of the expansion’s projects. OS Engineering provided controls integration and electrical design oversight. Olsson Construction Crews furnished and installed conduit, wiring and miscellaneous electrical hardware required for full operation of the new kilns.

    Scope

    • Furnished and installed conduit and cabling to support the new kilns
    • Provided detailed one-line drawings, submittal reviews and as-built documentation
    • Installed owner furnished PDCs for the new dimension kiln boilers, planer mill, and compressor/sorter/stacker

    Highlights

    • Zero safety incidents
    Client: Seneca Sawmill Company
    Location: Eugene, Oregon
    Timeline: 2015 – 2016
    Division: Construction & Engineering
    Value: $292,000

    Category:

    Heavy Industrial Electrical Construction
    Plant Automation
    Power System Design & Analysis

    Industry Served:

    Timber & Forest Products

    Area Served:

    Oregon
    Download a PDF of this page

    Related Projects

    Substation

    Vera Water & Power 16th Avenue Substation

    Read more
    Vera Water & Power 16th Avenue Substation

    The John Day North Fish Ladder AWS Pump Replacement

    Read more
    The John Day North Fish Ladder AWS Pump Replacement

    Back to Projects

    Read More

    McNary Lock & Dam Station Service Improvements

    Overview

    In May of 2014, Olsson Industrial Electric was awarded a prime contract to modernize the station service electrical distribution system at the McNary Lock and Dam – a four year effort to replace nearly all of the existing 4160 V Station Service equipment. Construction began with two iso-phase bus taps feeding new 15 kV switchgear assemblies for redundant distribution to new 480 V substations. Twenty-eight 4160 V governor oil pumps will be rewound to 480 V for compatibility with the new station service distribution.

    Ultimately, the modernization will convert the entire powerhouse to a redundant 480 V system. With the majority of new equipment installed in green field locations, the new system can be commissioned and energized in advance to minimize outages and disruptions to the plant. OS Engineering and Olsson Controls will provide significant support throughout the project making this a complete team effort.

    Scope

    • Remove nearly all existing 4160 V components
    • Install seven 15 kV and five 480 V switchgear lineups
    • Install 12 high resistance grounds and two 15 kV CLRs
    • Install two 4.16/13.8 kV 5MVA transformers, ten 13.8 kV/480 V transformers, one 13.8 V/12.47 kV 750 kA PSJ transformer, a 13.8 kV/480 V 1000 kVA transformer, two 13.8 kV/480 V 500 kVA transformers and two 480 V/208Y-120 V 225 kVA transformers
    • Install thirteen 480 V AC MCCs
    • Install 7 main unit switchboards

    Highlights

    • Design and implement temporary power solutions for continuity of powerhouse operations
    Client: U.S. Army Corps of Engineers
    Location: Umatilla, Oregon
    Timeline: May 2014 – Current
    Divisions: Construction, Controls & Engineering
    Value: $35,000,000

    Category:

    Heavy Industrial Electrical Construction
    Hydro Design
    Hydro Maintenance
    Power Distribution

    Industry Served:

    Hydroelectric & Hydropower

    Area Served:

    Oregon
    Download a PDF of this page

    Related Projects

    Substation

    Vera Water & Power 16th Avenue Substation

    Read more
    Vera Water & Power 16th Avenue Substation

    The John Day North Fish Ladder AWS Pump Replacement

    Read more
    The John Day North Fish Ladder AWS Pump Replacement

    Back to Projects

    Read More