Seneca Sawmill Co-Gen Facility

Overview

Olsson Industrial Electric was hired to complete the electrical installation of Seneca Sawmill’s Co-Generation facility located in Eugene, OR.

Scope

  • Installed 15 kV plant-wide distribution
  • 480 VAC MCC installation in the following locations: Truck Dump Area, Fuel Handling and Storage System, and Co-Gen building
  • PLC/Control System installation in the following locations: Truck Dump Area, Fuel Handling and Storage System, and Co-Gen building
  • Documented and rewired controls on 19 MW generator
  • Installed a plant-wide lighting system

Highlights

  • Zero safety incidents
Client: Seneca Sawmill Company
Location: Eugene, Oregon
Timeline: 2010
Divisions: Construction & Controls
Value: $2,600,000

Category:

Heavy Industrial Electrical Construction
Plant Automation
Power Distribution
Power System Design & Analysis

Industry Served:

Timber & Forest Products

Area Served:

Oregon
Download a PDF of this page

Related Projects

Substation

Vera Water & Power 16th Avenue Substation

Read more
Vera Water & Power 16th Avenue Substation

The John Day North Fish Ladder AWS Pump Replacement

Read more
The John Day North Fish Ladder AWS Pump Replacement

Back to Projects