Georgia Pacific Paper Converting SCADA System Upgrade

Overview OS Engineering completed a large-scale SCADA migration from the initial feasibility study and preliminary design, to the development of the new system, all the way through final startup and commissioning. A powerful but outdated system that was originally developed …

International Paper – Paper Machine Productivity Improvements

Overview Olsson Industrial Electric served as the lead electrical and controls contractor for a >$100M capital improvement project, increasing production capacity by more than 40,000 tons of containerboard per year. The Olsson construction management team worked hand-in-hand with the customer …

Seneca Sawmill Mill Equipment Upgrade/Installation

Overview In May of 2015, Olsson Industrial Electric initiated a mill expansion project for Seneca Sawmill in Eugene, Oregon. This expansion project incorporated multiple additions and upgrades, specifically to "Mill A" where Olsson installed new conduit, wiring and associated electrical …

ATI Intermediate Work Cell

Overview Olsson Industrial Electric completed a project to install a conveyor storage and robot work cell system in the ATI Titanium Foundry in Albany, Oregon. This project involved concept design, engineering and installation of a storage conveyor and robot work …

Bonneville Dam Station Service Improvements

Overview In October of 2011, Olsson Industrial Electric completed a prime contract to upgrade the Station Service electrical systems at the Bonneville Lock and Dam. Improvements included: the replacement of three double ended 480 V substations, associated medium voltage cabling, integration …

Seneca Sawmill Dimension Kilns Electric Installation

Overview In May of 2015, Olsson Industrial Electric initiated a mill expansion project for Seneca Sawmill in Eugene, Oregon. The expansion included multiple additions and upgrades. New dimension kilns were one of the expansion’s projects. OS Engineering provided controls integration …

ATI Cast Products Intermediate Robot and Conveyor System Project

Overview In January of 2015, Olsson Industrial Electric served as general contractor for the Intermediate Robot and Conveyor project installed at ATI Cast Products/Pacific Cast Technologies in Albany, Oregon. Olsson's Engineering personnel provided several services to facilitate the project. This …

Detroit and Big Cliffs Dam Reliability Upgrades

Overview Olsson Industrial Electric completed a project to upgrade integral electrical components at the respective powerhouses for Detroit and Big Cliff Dams. Olsson replaced vintage 13.8 kV gallery switchgear in both powerhouses. The Detroit Dam switchgear was previously destroyed in …

McNary Lock & Dam Station Service Improvements

Overview In May of 2014, Olsson Industrial Electric was awarded a prime contract to modernize the station service electrical distribution system at the McNary Lock and Dam - a four year effort to replace nearly all of the existing 4160 …

The Dalles Dam Station Service Improvements

Overview Olsson Industrial Electric completed a comprehensive modernization of the station service electrical distribution system at The Dalles Dam, a 2100 MW hydroelectric power generation facility, as the prime contractor. Olsson upgraded the existing 1950's vintage control system, rerouted and …

Seneca Sawmill Capital Upgrade

Overview Olsson Industrial Electric was selected to expand and upgrade the power distribution system at the Seneca Sawmill facility located in Eugene, OR – a $3M project. Designed and built by Olsson, the power distribution expansion includes: the relocation and …