In May of 2015, Olsson Industrial Electric initiated a mill expansion project for Seneca Sawmill in Eugene, Oregon. This expansion project incorporated multiple additions and upgrades, specifically to “Mill A” where Olsson installed new conduit, wiring and associated electrical hardware for more than 75 motors on a new trimmer/sorter line. In addition, Olsson also installed control wiring for two new edgers.

Scope

  • Furnished and installed new conduit and cabling for nearly all of the motors in the new trimmer/sorter line
  • Installed control wiring for two new edgers
  • Provided detailed one-line drawings, submittal reviews and as-built documentation

Highlights

  • Zero safety incidents while working in an active sawmill
Client: Seneca Sawmill Company
Location: Eugene, Oregon
Timeline: May 2015 – Current
Divisions: Construction, Controls & Engineering
Value: $715,000

Category:

Heavy Industrial Electrical Construction
Power System Design & Analysis
Automation System Analysis

Industry Served:

Timber & Forest Products

Area Served:

Oregon
Download a PDF of this page

Related Projects

Substation

Vera Water & Power 16th Avenue Substation

Read more
Vera Water & Power 16th Avenue Substation

The John Day North Fish Ladder AWS Pump Replacement

Read more
The John Day North Fish Ladder AWS Pump Replacement

Back to Projects