In May of 2015, Olsson Industrial Electric initiated a mill expansion project for Seneca Sawmill in Eugene, Oregon. This expansion project incorporated multiple additions and upgrades, specifically to “Mill A” where Olsson installed new conduit, wiring and associated electrical hardware for more than 75 motors on a new trimmer/sorter line. In addition, Olsson also installed control wiring for two new edgers.
Seneca Sawmill Mill Equipment Upgrade/Installation
Overview
Scope
- Furnished and installed new conduit and cabling for nearly all of the motors in the new trimmer/sorter line
- Installed control wiring for two new edgers
- Provided detailed one-line drawings, submittal reviews and as-built documentation
Highlights
- Zero safety incidents while working in an active sawmill
Client: Seneca Sawmill Company | |
Location: Eugene, Oregon | |
Timeline: May 2015 – Current | |
Divisions: Construction, Controls & Engineering | |
Value: $715,000 |
Category:
Heavy Industrial Electrical Construction | |
Power System Design & Analysis | |
Automation System Analysis |
Industry Served:
Timber & Forest Products |
Area Served:
Oregon |
Download a PDF of this page
Related Projects
Vera Water & Power 16th Avenue Substation
Read moreVera Water & Power 16th Avenue Substation
The John Day North Fish Ladder AWS Pump Replacement
Read moreThe John Day North Fish Ladder AWS Pump Replacement
The Dalles Dam Station Service Improvements
Read moreThe Dalles Dam Station Service Improvements