Kapstone #11 Paper Machine HCR Refiner and ENP Press Project

Overview

In 2013 Olsson Industrial Electric completed a project for Kapstone involving a commissioning shutdown that required 48 Electricians on a 24-hour schedule for 4 days.

Scope

  • 13.8 kV Power Distribution
  • 13.8 kV Soft Start
  • 575 V Switchgear
  • 12,000HP motor and control installation
  • Basler Field Exiter Enclosure
  • 1,200HP DC Drives and motors
  • 480 V MCC’s
  • Assemble and Install PLC panels
  • 575 V DC Motor Wiring
  • 120 VAC Control Wiring
  • 24 VDC Control Wiring
  • Communication Infrastructure
  • Lighting System

Highlights

  • Zero safety incidents
  • Involved a commissioning shutdown that required (48) Electricians on a 24 hour schedule for four days
Client: Kapstone
Location: Longview, WA
Timeline: Completed 2012
Divisions: Electric, Engineering, Controls
Value: $1,200,000

Related Projects

Superior Energy Arctic Challenger

Read more
Superior Energy Arctic Challenger
electricians

Kapstone #11 Paper Machine HCR Refiner and ENP Press Project

Read more
Kapstone #11 Paper Machine HCR Refiner and ENP Press Project
Electrical installation

Schnitzer Steel Mega Shredder – Electrical Installation

Read more
Schnitzer Steel Mega Shredder – Electrical Installation

Back to Projects