Kapstone #11 Paper Machine HCR Refiner and ENP Press Project

Overview

In 2013, Olsson Industrial Electric completed a project for Kapstone involving a commissioning shutdown that required 48 electricians on a 24-hour schedule for 4 days.

Scope

  • 13.8 kV power distribution
  • 13.8 kV soft start
  • 575 V switchgear
  • 12,000 HP motor and control installation
  • Basler Field exiter enclosure
  • 1,200 HP DC drives and motors
  • 480 V MCC’s
  • Assemble and install PLC panels
  • 575 VDC motor wiring
  • 120 VAC control wiring
  • 24 VDC control wiring
  • Communication infrastructure
  • Lighting system

Highlights

  • Zero safety incidents
  • Involved a commissioning shutdown that required 48 Electricians on a 24-hour schedule for four days
Client: Kapstone
Location: Longview, WA
Timeline: 2012 – 2013
Divisions: Electric, Engineering & Controls
Value: $1,200,000

Category:

Hydro Design
Power Distribution
Power System Design & Analysis
Automation System Analysis

Industry Served:

Pulp & Paper

Area Served:

Washington
Download a PDF of this page

Related Projects

Substation

Vera Water & Power 16th Avenue Substation

Read more
Vera Water & Power 16th Avenue Substation

The John Day North Fish Ladder AWS Pump Replacement

Read more
The John Day North Fish Ladder AWS Pump Replacement

Back to Projects