Douglas County PUD – Wells Dam MCC Replacement

Manufacture and deliver (20) Motor Control Centers (MCC's). Install (10) of the Motor Control Centers for A-Boards. The other (10) B-board Motor Control Centers were installed by the District. Install associated wiring and supporting hardware to allow for Motor Control Center Installation

Douglas County PUD – Wells Dam GSU Transformer Replacement

At Wells Dam in Douglas County, Washington, Olsson Industrial Electric manufactured, installed, tested, and commissioned five new generator step-up transformers as part of a major replacement project. The work also included removal and disposal of the existing GSU transformers, new transformer oil supply with lab analysis, and proper disposal of multiple batches of existing transformer oil.

USACE – Foster Dam Electrical Reliability Upgrade

For the Foster Dam Electrical Reliability Upgrade in Sweet Home, Oregon, Olsson Industrial Electric helped modernize the existing power system through demolition, replacement, and integration of critical equipment. Work included new 4160V switchgear, transformers, motor control centers, panelboards, SCADA PLC and ER cabinets, a diesel generator system, ventilation upgrades, and in-house controls integration for complex switchgear systems.

USACE – Chief Joseph Dam Spillway Sump Pump and Controls Upgrade

At Chief Joseph Dam in Douglas County, Washington, Olsson Industrial Electric removed and replaced conduit, wiring, and PLC controls supporting vertical line shaft motors and submersible pumps. The project also integrated new 5kV switchgear into the PLC control system, included breaker troubleshooting for NEC compliance, installed wiring for a new trolley system, and provided engineering support throughout construction.

USACE – McNary Powerhouse Precipitation Replacement

This project involves the demolition and replacement of key electrical and control system components to support four new pump motors and updated system functionality. The work includes disconnecting, removing, and disposing of all existing cable, conduit, and electrical equipment associated with the project, as well as installing new power distribution...