USACE – Chief Joseph Dam Spillway Sump Pump and Controls Upgrade

SCOPE OF WORK

  • Removal and replacement of existing conduit, wiring, and PLC controls for the following:
    • (2) Vertical line shaft motors
    • (5) Water jacketed submersible pumps
  • Addition of 5kV switchgear SP1, SP2, SP3, SP4, SP5, SP6, and SP7 to the new PLC controls system.
  • Troubleshooting of existing 5kV breakers to assure they are NEC compliant with new pump motors.
  • Installation of conduit and wiring for new trolley system.
  • Engineering support to USACE throughout Project.