Category: Automation System Analysis

SAFETY FIRST • ON SCHEDULE • UNDER BUDGET

Kapstone 11 Paper Machine HCR Refiner and ENP Press Project

Olsson Industrial Electric was selected to expand and upgrade the power distribution system at the Seneca Sawmill facility located in Eugene, OR – a $3M project. Designed and built by Olsson, the power distribution expansion includes: the relocation and installation of new 12.47 kV overhead to cable risers; new medium...

USACE – Ice Harbor Lock and Dam Digital Governor Upgrade

Olsson Industrial Electric completed a digital governor upgrade at the Ice Harbor Lock and Dam. Olsson removed the existing governors and associated controls. New conduit and cabling was installed to support the replacement digital governors in main units 1-3. In addition, Olsson repaired several blade and gate distributing valves and...

Schnitzer Steel Mega Shredder Electrical Installation

In 2007, Olsson Industrial Electric completed an electrical installation at Schnitzer Steel’s brand new facility in Portland, Oregon

Vera Water Power 16th Avenue Substation

While working with Vera Water and Power, OS Engineering determined that additional system capacity was needed to meet growth requirements to provide quality reliability in the near and long-term future. OS Engineering prepared complete design drawings for the construction of Vera’s 16th Avenue Substation as well as provided services during...

Seneca Sawmill – Mill A Equipment Upgrade Installation

In May of 2015, Olsson Industrial Electric initiated a mill expansion project for Seneca Sawmill in Eugene, Oregon. This expansion project incorporated multiple additions and upgrades, specifically to “Mill A” where Olsson installed new conduit, wiring and associated electrical hardware for more than 75 motors on a new trimmer/sorter line....

International Paper – Paper Machine Productivity Improvements

Olsson Industrial Electric served as the lead electrical and controls contractor for a >$100M capital improvement project, increasing production capacity by more than 40,000 tons of t per year. The Olsson construction management team worked hand-in-hand with the customer to plan and execute a complex construction sequence, maximize pre-outage construction...

Greenberry Industrial Cosmo Specialty Fibers Paper Mill Start Up

Olsson Industrial Electric completed a project in the spring of 2012 that included the start-up and commissioning of a paper mill that had been shuttered for the past five years. Due to a compressed construction schedule, the Olsson field crew worked around the clock in order to complete the project....