Vera Water & Power 16th Avenue Substation

Overview

While working with Vera Water and Power, OS Engineering determined that additional system capacity was needed to meet growth requirements to provide quality reliability in the near and long term future. OS Engineering prepared complete design drawings for the construction of Vera’s 16th Avenue Substation as well as providing services during construction including relay settings and start-up assistance.

Scope

  • Prepared and distributed Power Transformer Contract Documents followed by evaluation and award recommendation. Service included witnessing transformer testing.
  • Prepared and distributed Circuit Switcher Contract Documents followed by evaluation and award recommendation.
  • Prepared and distributed Relay and Control Panel Contract Documents followed by evaluation and award recommendation.
  • Prepared complete project design drawings.
  • Prepared and distributed Substation Construction Contract Documents, including pre-bid meeting presentation followed by evaluation and award recommendation.
  • Provided services during construction to respond and resolve any issues that arose during construction.
  • Provided relay settings, programming and start-up assistance.

Highlights

  • The substation was energized in October 2016 and has been reliable to Vera customer’s since.
Client: Vera Water & Power
Location: Spokane Valley, Washington
Timeline: February 2015 – October 2016
Divisions: Engineering
Value: $2,400,000

Related Projects

Superior Energy Arctic Challenger

Read more
Superior Energy Arctic Challenger
electricians

Kapstone #11 Paper Machine HCR Refiner and ENP Press Project

Read more
Kapstone #11 Paper Machine HCR Refiner and ENP Press Project
Electrical installation

Schnitzer Steel Mega Shredder – Electrical Installation

Read more
Schnitzer Steel Mega Shredder – Electrical Installation

Back to Projects