Kapstone 11 Paper Machine HCR Refiner and ENP Press Project

OVERVIEW

Olsson Industrial Electric was selected to expand and upgrade the power distribution system at the Seneca Sawmill facility located in Eugene, OR – a $3M project. Designed and built by Olsson, the power distribution expansion includes: the relocation and installation of new 12.47 kV overhead to cable risers; new medium voltage circuits in ductbanks for existing vacuum fault interrupters and a new 15 kV, 6-way padmount switch; installation of seven substation transformers rated 1000 kVA to 2000 kVA; installation of new 15 kV pad-mounted switchgear; and extensive 480 V switchgear and switchboard installation.

One phase of the construction included the installation of a 2000/2300 kVA, Class I, 3-Phase, oil-immersed transformer. The transformer was tied into the existing system with the primary connected to 15 kV switchgear and the 480 V secondary feeding a new compressor/sorter/stacker line via switchgear. The transformer was installed in an active sawmill without any safety incidents or unintended process interruptions.

SCOPE OF WORK

  • Install seven Class 1, oil filled transformers rated 1500 kVA to 2000 kVA
  • Relocation and installation of new 12.47 kV overhead to cable risers
  • New medium voltage circuits in ductbanks for existing vacuum fault interrupters
  • Install a new 15 kV, 6-way padmount switch
  • Install a new 15 kV pad-mounted switchgear
  • Extensive 480 V switchgear and switchboard installation