Power System Design & Analysis Projects

Superior Energy Arctic Challenger

Overview In September of 2012, Olsson Industrial Electric completed a 10-month electrical installation project for Superior Energy's Arctic Challenger. Olsson field crews installed, tested and commissioned nearly all of the electrical power distribution equipment for the vessel. Electricians worked around the …

Kapstone #11 Paper Machine HCR Refiner and ENP Press Project

Overview In 2013, Olsson Industrial Electric completed a project for Kapstone involving a commissioning shutdown that required 48 electricians on a 24-hour schedule for 4 days. Scope13.8 kV power distribution13.8 kV soft start575 V switchgear12,000 HP motor and control installationBasler …

Schnitzer Steel Mega Shredder – Electrical Installation

Overview In 2007, Olsson Industrial Electric completed an electrical installation at Schnitzer Steel's brand new facility in Portland, Oregon. Scope Olsson installed the following items: 12.5 kV power distribution4160 V power distribution3,400 concrete encased duct bankSubstation building electricalShredder Building electrical …

Vera Water & Power 16th Avenue Substation

Overview While working with Vera Water and Power, OS Engineering determined that additional system capacity was needed to meet growth requirements to provide quality reliability in the near and long-term future. OS Engineering prepared complete design drawings for the construction …

Seneca Sawmill Mill Equipment Upgrade/Installation

Overview In May of 2015, Olsson Industrial Electric initiated a mill expansion project for Seneca Sawmill in Eugene, Oregon. This expansion project incorporated multiple additions and upgrades, specifically to "Mill A" where Olsson installed new conduit, wiring and associated electrical …

Seneca Sawmill Co-Gen Facility

Overview Olsson Industrial Electric was hired to complete the electrical installation of Seneca Sawmill's Co-Generation facility located in Eugene, OR. ScopeInstalled 15 kV plant-wide distribution480 VAC MCC installation in the following locations: Truck Dump Area, Fuel Handling and Storage System, …

Greenberry Cosmo Specialty Fibers Paper Mill Start-Up

Overview Olsson Industrial Electric completed a project in the spring of 2012 that included the start-up and commissioning of a paper mill that had been shuttered for the past five years. Due to a compressed construction schedule, the Olsson field crew …

Seneca Sawmill Dimension Kilns Electric Installation

Overview In May of 2015, Olsson Industrial Electric initiated a mill expansion project for Seneca Sawmill in Eugene, Oregon. The expansion included multiple additions and upgrades. New dimension kilns were one of the expansion’s projects. OS Engineering provided controls integration …

ATI Cast Products Intermediate Robot and Conveyor System Project

Overview In January of 2015, Olsson Industrial Electric served as general contractor for the Intermediate Robot and Conveyor project installed at ATI Cast Products/Pacific Cast Technologies in Albany, Oregon. Olsson's Engineering personnel provided several services to facilitate the project. This …

Ice Harbor Lock and Dam Digital Governor Upgrade

Overview Olsson Industrial Electric completed a digital governor upgrade at the Ice Harbor Lock and Dam. Olsson removed the existing governors and associated controls. New conduit and cabling was installed to support the replacement digital governors in main units 1-3. …