Olsson’s scope of work consisted of the following:
- Supply of new medium voltage MCC lineup.
- Removal of existing and installation of new medium voltage MCC lineup.
- Removal of existing and installation of new drainage pumps.
- Removal of existing and installation of new unwatering pumps.
- Cybersecurity work
- Drainage gallery oil water separator electrical and controls
OS Engineering provided substantial engineering and design efforts to vet-out the design issues and provide a complete and functional product.