Construction, Controls, Engineering, Heavy industrial Electrical Construction, Oregon Gray Construction – MCG Pure Chemical O-Plant Phase 1 – Olsson Electric

Gray Construction – MCG Pure Chemical O-Plant Phase 1

SCOPE OF WORK

  • Designed, manufactured, and installed the following electrical gear:
    • (1) 2500A 480V Main Switchgear Lineup
    • (1) 3000 kW Standby Generator with Automatic Transfer Switching Capabilities
    • (1) 14-Section 480V MCC Lineup
    • (1) 800A 480V Distribution Panel
    • (1) 400A 480V Distribution Panel
    • (5) 225A 480V Distribution Panels
    • (12) Lighting Transformers
    • (15) Local Lighting Panels
    • Site Lighting with Lighting Controls
    • PLC Logix and DCS Controls for Entire Plant Site
    • 480V Power Wiring for Entire Plant
    • (28,000 feet) Underground Conduit
  • Olsson Industrial Electric, alongside OS Engineering, Olsson Controls, and OS Construction provided
    engineering and commissioning services throughout the project.