For MCG Pure Chemical’s O-Plant Phase 1 in Forest Grove, Olsson Industrial Electric designed, manufactured, and installed major electrical infrastructure for the new facility. The project included main switchgear, a 3000 kW standby generator, MCCs, distribution panels, lighting systems, plant-wide power wiring, controls integration, and extensive underground conduit, with engineering and commissioning support from the broader Olsson team.