Harder Mechanical – MCG Pure Chemical O-Plant Phase 2

Olsson Industrial Electric finished Phase 1 of the MGC Pure Chemical Plant in Forest Grove in 2019. Quickly after, Phase 2 was sent out for Bid and Olsson was the successful electrical contractor with Harder Mechanical working as the general contractor

Gray Construction – MCG Pure Chemical O-Plant Phase 1

For MCG Pure Chemical’s O-Plant Phase 1 in Forest Grove, Olsson Industrial Electric designed, manufactured, and installed major electrical infrastructure for the new facility. The project included main switchgear, a 3000 kW standby generator, MCCs, distribution panels, lighting systems, plant-wide power wiring, controls integration, and extensive underground conduit, with engineering and commissioning support from the broader Olsson team.

Benchmade – Overall Plant Upgrades

From 2021 to 2022, Olsson Industrial Electric supported more than 40 projects as part of a broad modernization effort at Benchmade’s Portland manufacturing facility. Work included plant-wide electrical maintenance, power, lighting, IT, and network upgrades, along with improvements to automated blade mills, assembly lines, bevel grinders, laser engravers, and PLC panels, with engineering and commissioning support provided throughout.