Engineering, Hydro Design, Hydro Maintenance, Hydroelectric & Hydropower, Power Distribution, Power System Design & Analysis USACE – Robert S. Kerr Dam Modernization of Electrical Infrastructure – Olsson Electric

USACE – Robert S. Kerr Dam Modernization of Electrical Infrastructure

SCOPE OF WORK

  • Overall Project consisted of the following:
    • Replacement of (4) main 15kV switchgear lineups 
    • Replacement of 480V station service switchgear 
    • Installation of new Generator Step-up (GSU) transformers, supplied by others
    • New 15 kV bus from generator to switchgear and from GSU transformers to switchgear 
    • Replacement if unwatering/sump pumps and motors 
    • Replacement of draft tube and spiral case valves
    • Transformer deluge and deluge containment 
    • Governor kidney loop system
  • Olsson was instrumental in the re-design of the GSU transformer power distribution. Olsson, alongside OS Engineering and Stoddard Power Systems, proposed a new location for the GSU’s that resulted in an underground duct bank for the MV conductors in place of aerial. 
  • OS Engineering, with the help of Stoddard Power Systems, provided expensive Engineering assistance to the CORPS throughout the project as well as commissioning and FAT testing of new switchgear. 
  • Olsson performed all of the switchgear controls integration locally at our panel shop in Springfield, OR and had the switchgear delivered to Tulsa, OK. 

CATEGORY:

INDUSTRY SERVED:

AREA SERVED: