• Removal of (2) existing station service transformers
• Design, manufacture, deliver, and install (2) new 3-phase, oil filled, station service
transformers
• Design, manufacture, deliver, and install digital trip retrofits for the existing breakers
• Disconnect and remove existing CO2 fire suppression system
• Install new oil containment curbing
• Design, manufacture, deliver, and install new fire dampers and fire rated vault
walls/doors