Heavy industrial Electrical Construction, Plant Automation, Power Distribution, Power System Design & Analysis Seneca Sawmill Co-Gen Facility - Olsson Electric

Seneca Sawmill Co-Gen Facility

OVERVIEW

Olsson Industrial Electric was hired to complete the electrical installation of Seneca Sawmill’s Co-Generation facility located in Eugene, OR.

SCOPE OF WORK

  • Installed 15 kV plant-wide distribution
  • 480 VAC MCC installation in the following locations: Truck Dump Area, Fuel Handling and Storage System, and Co-Gen building
  • PLC/Control System installation in the following locations: Truck Dump Area, Fuel Handling and Storage System, and Co-Gen building
  • Documented and rewired controls on 19 MW generator
  • Installed a plant-wide lighting system