Quick Facts

CLIENT:

U.S. Army Corps of Engineers

LOCATION:

Marion County, Oregon

TIMELINE:

Sept 2007 - Dec 2011

DIVISIONS:

Controls
Engineering

VALUE:

$11,300,000

Overview

Olsson Industrial Electric completed a project to upgrade integral electrical components at the respective powerhouses for Detroit and Big Cliff Dams. Olsson replaced vintage 13.8kV gallery switchgear in both powerhouses. The Detroit Dam switchgear was previously destroyed in a fire, lowering the dam’s output potential. This project restored Detroit Dam to full potential and provided much needed reliability upgrades to the respective dams.

Scope

  • Replaced 15kV switchgear
  • Replaced 15kV non-segregated bus
  • Replaced 15kV isolated phase bus
  • Replaced DC panel boards
  • Replaced MCCS and CLRs
  • Designed and installed emergency backup generators (diesel)
  • Control board upgrades
  • Transformer replacements

Highlights

  • Zero safety incidents with more than 36,000 hours of on-site work
  • “Above Average” performance rating from the U.S. Army Corps of Engineers