Olsson Industrial Electric completed a project to upgrade integral electrical components at the respective powerhouses for Detroit and Big Cliff Dams. Olsson replaced vintage 13.8 kV gallery switchgear in both powerhouses. The Detroit Dam switchgear was previously destroyed in a fire, lowering the dam’s output potential. This project restored Detroit Dam to full potential and provided much needed reliability upgrades to the respective dams.
Detroit and Big Cliffs Dam Reliability Upgrades
Overview
Scope
- Replaced 15 kV switchgear
- Replaced 15 kV non-segregated bus
- Replaced 15 kV isolated phase bus
- Replaced DC panel boards
- Replaced MCCs and CLRs
- Designed and installed emergency backup generators (diesel)
- Control board upgrades
- Transformer replacements
Highlights
- Zero safety incidents with more than 36,000 hours of on-site work
- “Above Average” performance rating from the U.S. Army Corps of Engineers
Client: U.S. Army Corps of Engineers | |
Location: Marion County, Oregon | |
Timeline: September 2007 – December 2011 | |
Divisions: Controls & Engineering | |
Value: $11,300,000 |
Category:
Hydro Maintenance |
Industry Served:
Hydroelectric & Hydropower |
Area Served:
Oregon |
Download a PDF of this page
Related Projects
Vera Water & Power 16th Avenue Substation
Read moreVera Water & Power 16th Avenue Substation
The John Day North Fish Ladder AWS Pump Replacement
Read moreThe John Day North Fish Ladder AWS Pump Replacement
The Dalles Dam Station Service Improvements
Read moreThe Dalles Dam Station Service Improvements