Olsson Industrial Electric completed a project to replace several existing Woodward governors at the Bonneville Lock and Dam, Powerhouse II. Olsson removed the existing mechanical governors and associated controls. New conduit and cabling was installed to support the replacement digital governors in main units 11-18 and fish units F1 and F2. In addition, Olsson repaired and refurbished several distributing valves, designed and fabricated transducer mounting brackets and performed asbestos abatement.
Bonneville Lock and Dam Digital Governor Installation
Overview
Scope
- Removed existing Woodward governors and controls (Units 11-18, F1 and F2)
- Installed new conduit and cabling to support digital governors and controls
- Installed new Government furnished governor controls
- Disassembled and refurbished or repaired distributing valves
- Designed and fabricated transducer mounting brackets
- Designed and installed supporting bracket assemblies for Government furnished equipment
- Performed asbestos abatement
Highlights
- Zero safety incidents
Client: U.S. Army Corps of Engineers | |
Location: Cascade Locks, Oregon | |
Timeline: January 2013 – September 2014 | |
Divisions: Construction, Controls & Engineering | |
Value: $2,300,000 |
Category:
Heavy Industrial Electrical Construction | |
Hydro Design |
Industry Served:
Hydroelectric & Hydropower |
Area Served:
Oregon |
Download a PDF of this page
Download a PDF of this page
Related Projects
Vera Water & Power 16th Avenue Substation
Read moreVera Water & Power 16th Avenue Substation
The John Day North Fish Ladder AWS Pump Replacement
Read moreThe John Day North Fish Ladder AWS Pump Replacement
The Dalles Dam Station Service Improvements
Read moreThe Dalles Dam Station Service Improvements