Olsson Industrial Electric was hired to complete the electrical installation of Seneca Sawmill’s Co-Generation facility located in Eugene, OR.
Seneca Sawmill Co-Gen Facility
Overview
Scope
- Installed 15 kV plant-wide distribution
- 480 VAC MCC installation in the following locations: Truck Dump Area, Fuel Handling and Storage System, and Co-Gen building
- PLC/Control System installation in the following locations: Truck Dump Area, Fuel Handling and Storage System, and Co-Gen building
- Documented and rewired controls on 19 MW generator
- Installed a plant-wide lighting system
Highlights
- Zero safety incidents
| Client: Seneca Sawmill Company | |
| Location: Eugene, Oregon | |
| Timeline: 2010 | |
| Divisions: Construction & Controls | |
| Value: $2,600,000 |
Category:
| Heavy Industrial Electrical Construction | |
| Plant Automation | |
| Power Distribution | |
| Power System Design & Analysis |
Industry Served:
| Timber & Forest Products |
Area Served:
| Oregon |