In 2013, Olsson Industrial Electric completed a project for Kapstone involving a commissioning shutdown that required 48 electricians on a 24-hour schedule for 4 days.
Kapstone #11 Paper Machine HCR Refiner and ENP Press Project
Overview
Scope
- 13.8 kV power distribution
- 13.8 kV soft start
- 575 V switchgear
- 12,000 HP motor and control installation
- Basler Field exiter enclosure
- 1,200 HP DC drives and motors
- 480 V MCC’s
- Assemble and install PLC panels
- 575 VDC motor wiring
- 120 VAC control wiring
- 24 VDC control wiring
- Communication infrastructure
- Lighting system
Highlights
- Zero safety incidents
- Involved a commissioning shutdown that required 48 Electricians on a 24-hour schedule for four days
Client: Kapstone | |
Location: Longview, WA | |
Timeline: 2012 – 2013 | |
Divisions: Electric, Engineering & Controls | |
Value: $1,200,000 |
Category:
Hydro Design | |
Power Distribution | |
Power System Design & Analysis | |
Automation System Analysis |
Industry Served:
Pulp & Paper |
Area Served:
Washington |
Download a PDF of this page
Related Projects
Vera Water & Power 16th Avenue Substation
Read moreVera Water & Power 16th Avenue Substation
The John Day North Fish Ladder AWS Pump Replacement
Read moreThe John Day North Fish Ladder AWS Pump Replacement
The Dalles Dam Station Service Improvements
Read moreThe Dalles Dam Station Service Improvements