In September of 2012, Olsson Industrial Electric completed a 10-month electrical installation project for Superior Energy’s Arctic Challenger. Olsson field crews installed, tested and commissioned nearly all of the electrical power distribution equipment for the vessel. Electricians worked around the clock to complete the project on time. Scheduling included a 4-month period of time in which 40 Olsson electricians worked seven, twelve-hours shifts.
Superior Energy Arctic Challenger
Overview
Scope
- 480 V power distribution
- Class I Division I and II electrical installation
- Extensive instrumentation device calibration and installation
- Instrumentation tubing installation
- Cable tray design
- 24 VDC process control
Highlights
- Zero safety incidents
Client: Superior Energy | |
Location: Bellingham, Washington | |
Timeline: Completed September 2012 | |
Divisions: Construction, Controls & Engineering | |
Value: $4,600,000 |
Category:
Heavy Industrial Electrical Construction | |
Power Distribution | |
Power System Design & Analysis |
Area Served:
Washington |
Download a PDF of this page
Related Projects
Vera Water & Power 16th Avenue Substation
Read moreVera Water & Power 16th Avenue Substation
The John Day North Fish Ladder AWS Pump Replacement
Read moreThe John Day North Fish Ladder AWS Pump Replacement
The Dalles Dam Station Service Improvements
Read moreThe Dalles Dam Station Service Improvements