In 2007, Olsson Industrial Electric completed an electrical installation at Schnitzer Steel’s brand new facility in Portland, Oregon.
Schnitzer Steel Mega Shredder – Electrical Installation
Overview
Scope
Olsson installed the following items:
- 12.5 kV power distribution
- 4160 V power distribution
- 3,400 concrete encased duct bank
- Substation building electrical
- Shredder Building electrical and controls
- Water system power, controls and instrumentation
- Fiber-optic communication system
- Camera system
Highlights
- Zero safety incidents
| Client: Schnitzer Steel | |
| Location: Portland, Oregon | |
| Timeline: 2007 | |
| Divisions: Construction, Controls & Engineering | |
| Value: $2,950,000 |
Category:
| Hydro Design | |
| Power System Design & Analysis | |
| Automation System Analysis |
Industry Served:
| Metal & Recycling |
Area Served:
| Washington |