In 2007 Olsson Industrial Electric, OS Engineering and Olsson controls (collectively, “Olsson”) completed an electrical installation of a brand new facility for Schnitzer Steel in Portland, Oregon.

Scope

  • Olsson installed the following items:
  • 12.5 kV power distribution
  • 4160 V power distribution
  • (3,400′) concrete encased ductbank
  • Substation building electrical
  • Shredder Building electrical and controls
  • Water system power, controls and instrumentation
  • Fiber optic communication system
  • Camera system

Highlights

  • Zero safety incidents
Client: Schnitzer Steel
Location: Portland, Oregon
Completed: 2007
Divisions: Construction, Controls and Engineering
Value: $2,950,000

Related Projects

Superior Energy Arctic Challenger

Read more
Superior Energy Arctic Challenger
electricians

Kapstone #11 Paper Machine HCR Refiner and ENP Press Project

Read more
Kapstone #11 Paper Machine HCR Refiner and ENP Press Project
Electrical installation

Schnitzer Steel Mega Shredder – Electrical Installation

Read more
Schnitzer Steel Mega Shredder – Electrical Installation

Back to Projects