PCA Wallula – Overall Plant Upgrades

SCOPE OF WORK

  • From 2018-2023, Olsson Industrial Electric completed over 300 electrical projects for the Wallula Paper Mill. With (3) fully functioning paper machines, the Wallula Mill can integrate over 200,000 tons of containerboard. Completed projects included, but were not limited to, the following:
    • OCC Facility Upgrade; including the demolition of existing infrastructure and installation of new electrical infrastructure in the existing 180,000 SF building.
      • Dollar value – $5,440,000
    • Woodyard Automation Upgrade; consisted of a new 3000A service to power (2) automated chip conveyors and associated equipment.
      • Dollar Value – $6,000,000
    • W3 Drives Upgrade; consisted of installation of (6) new 480V drive line-ups and all associated electrical components including a new 4000A electrical service to each line-up.
      • Dollar Value – $3,100,000
    • Overall plant maintenance and various smaller projects over the 6-year span
      • Dollar value range – $10,000 – $700,000 (Over 300 Total Projects)
    • Provided onsite project management support and assisted with scoping various projects with plant personnel.